Product Details
Place of Origin: Hunan
Brand Name: Sunny
Model Number: LB1000
Document: Product Brochure PDF
Payment & Shipping Terms
Minimum Order Quantity: 1 set
Price: USD250,000-50,0000 PER SET
Packaging Details: FULL CONTAINER
Delivery Time: 20-35DAYS
Payment Terms: L/C,T/T,Western Union,MoneyGram
Supply Ability: 50 SET PER MONTH
Warranty: |
1 Year |
After-sales Service Provided: |
Engineers Available To Service Machinery Overseas |
Type: |
Asphalt Mixing Plant |
Application: |
High-grade Asphalt Road Paving,Construction Areas,Road Construction Asphalt Plant |
Control System: |
PLC+colorized Touching Screen |
Warranty: |
1 Year |
After-sales Service Provided: |
Engineers Available To Service Machinery Overseas |
Type: |
Asphalt Mixing Plant |
Application: |
High-grade Asphalt Road Paving,Construction Areas,Road Construction Asphalt Plant |
Control System: |
PLC+colorized Touching Screen |
80t/h asphalt hot mixing machine price
The asphalt plant adopts modular design, easy installation and maintenance, fast removal and transportation. It is mainly used for the construction of highways, highways, municipal roads, airports and ports.
For more information please contact us by whatsapp directly
Production Capacity: The LB1000 model typically has a production capacity of 80 tons per hour, making it suitable for medium-scale asphalt production.
Mixing System: The plant incorporates a twin-shaft paddle mixer that ensures thorough mixing of aggregates, filler, and bitumen. This results in a high-quality asphalt mixture with excellent consistency and uniformity.
Precise Measurement and Control: The LB1000 plant is equipped with accurate weighing systems for aggregates, filler, and bitumen, ensuring precise dosing. The control system allows for adjustments in mixing ratios and temperature settings, allowing flexibility in producing various asphalt mix designs while maintaining consistent quality.
Model | Rated Output | Mixer Capacity | Dust removal effect | Total power | Fuel consumption | Fire coal | Weighing accuracy | Hopper Capacity | Dryer Size |
LB1000 | 80t/h | 1000kg |
≤20 mg/Nm³ |
264kw |
5.5-7 kg/t |
10kg/t |
aggregate;±5‰ powder;±2.5‰ asphalt;±2.5‰ |
4×8.5m³ | φ1.75m×7m |
LB1300 | 100t/h | 1300kg | 264kw | 4×8.5m³ | φ1.75m×7m | ||||
LB1500 | 120t/h | 1500kg | 325kw | 4×8.5m³ | φ1.75m×7m | ||||
LB2000 | 160t/h | 2000kg | 483kw | 5×12m³ | φ1.75m×7m |